SPECIALIZED BUILDING MATERIALS

BITUMAT
  • Extension of Distribution Network at Doha Vicinity Phase 6 Package B GTC/644B/2014
  • Expressways Group 15 P015-Al Wakra Bypass road
  • Design and Build of Al Wakra Hotels
  • New Orbital Highway & Truck Route P023: Contract 2, Salwa Road to North Relief Road
  • Roads & Infrastructure in Doha Industrial Area – 1A/13-14/C005 ST
  • C2016/16 RIW Various Areas of Greater Doha Phase 3
  • QPMC Cement Terminal at Mesaieed Gabbro Berth – External Work (Phase-4)
  • Infrastructure Works@wadi bridge crossing between seef lusail
  • New Orbital Highway & Truck Route Project (P023) – Contract 4
  • Construction of Bypass from Rawdat Rashed Village to Umm Garn – Package 1
  • Roads and Infrastructure in Warrah West MMUP Phase 2, Package 14
  • RIW in Various Area of Greater Doha Phase 2 – Old Airport 32
  • Pipelines for Mega Reservoir, East Corridor Main 2 – Package B
  • Roads and Infrastructure in the North Part of New Slata (Zone 40)
  • Rehabilitation of Existing Sewers within Doha
  • Extension of Distribution Network at Doha Vicinity Phase 5 Package A
  • Design and Build of Man Diesel and Turbo Workshop at Ras Laffan Industrial Complex
  • Construction of East Corridor P011 Package 2
  • Construction of Masjids and Imam Houses at Various Location
  • WOQOD Petrol Station @ Lijmiliya
  • Flow Diversion Schemes for PS31 & PS5
  • Qatar Integrated Railways Project
  • P-6B Waterfront/Kharaej Tower
  • Retail and Office Building
  • South Side Wide Infrastructure and Landscaping Works
  • Police Training Institute
LAMA
  • Roads and infrastructures in Wakra west mmup ph2
  • Rawdat Rasheed Road
  • RIW in Various areas of greater Doha phase 2 old airport
  • Improvement of roads surrounding duhail ISF camp
  • Construction of central market development project ay umm slal
  • Rehabilitation in doha south (foul network)
  • Refurbishment and upgrading of works for various pumping stations phase 8
  • Doha & Rayyan Sewarage
  • Doha north sewage treatment works
  • Doha rayyan sewerage treatment
  • Police Training Institute
  • Epic for Portable water supply to UMM bab,Jaleha & Khatiyah north
  • Pipelines for Mega Reservoirs corridor Main 2,Package B
  • Extension of Laawena Majlis & guest House
  • Construction of Residential Building plot n-27 at Fox Hills Lusail
  • Design & build of MAN diesel and Turbo workshop At RLIC qatar
  • Tempoarary package treatment plant at various loactions
  • Labour City Accomodation
  • Doha rayyan sewerage schemes industrial area
  • South side wide Infrastructure works Qatar foundation
  • Villa @ pearl Qatar
  • Design & Build court yard no.3 at Amiri Diwan
  • Q.city Compound Umm Slal Shiekh Khalid Saud AH Al-Thani
  • Construction of bypass from Rawda rahed
    village to UMM garn-Package 1
  • Q.city Compoound UMM slal
  • Constrution of Extension of Al khor
  • B+G+1+P Villa@ pearl Qatar (f.f 12)
Alyaf
  • Construction of Jemailiya & Al Shihaniyah road (project 019)
  • New orbital highway & Truck route project P023 Contract 4
  • Construction of east corridor PO11 package 2
  • Refurbishment and upgrading of works for various pumping stations phase 8
  • Peripheral roads to barwa city
  • Doha rayyan sewerage for various packages
  • Doha Expressway package 7 salwa road phase 2
  • RIW in Various areas of greater Doha phase 2 old airport
  • New Port Project
  • P023 new orbital highway & Truck route salwa road to North relief road
  • Rawdat Rasheed Road
  • Roads & Infrastructure In saliya North
  • Upgrading of existing route 55 single carriage connecting doha to UMM saied
  • Refurbishment and upgrading works for various pumping stations
  • Doha Expressway (P012)muntazah street extension project (package 13)
  • RIW out in greater Doha Access roads to farm & villages Phase 3
  • Construction of Central Market development Project at UMM slal
  • North East Car Park Qatar Foundation
  • Qatar Integrated Railways Project
Jolly Board
  • Rawdat Rasheed Road
  • Rehabilitation of Existing Sewers within Doha
  • Al Khor Sewerage Extension to Al Khor Sewerage Treatment Works (STW) Phase II
  • Al Khor Sewerage Extension to Al Khor Sewerage Treatment Works (STW) Phase II
    Doha and Rayyan Sewerage Construction of Sewerage Schemes for Various Areas (CP 751/1-Package 1)
  • Conversion of Tadamon and Mall R/A to Signalized Junction
  • Transmission Pipelines for Mega Reservoirs
  • Design & build of MAN diesel and Turbo workshop At RLIC qatar
  • KIA workshop at Industrial Area-Al Attiyah Motors
  • Qatar Integrated Railways Project
  • Rehabilitation of Existing Sewers within Doha
  • Extension of Woqod Petrol Station at Industrial Area
  • Qatar Integrated Railways Project
  • Advanced Pipes & Casts Factory in Mesaieed Area
  • Barzan Onshore Project – Ras Laffan Industrial City
  • Al Khor Sewerage Extension to Al Khor Sewerage Treatment Works (STW) Phase II
  • Qatar Power Transmission Expansion Phase 10 Substation Package S5 & S8
  • Civil and Electrical Refurbishment Work at Various Accomodation in Dukhan Township
  • Doha and Rayyan Sewerage Construction of Sewerage Schemes for Various Areas (CP 751/1-Package 1)
  • Conversion of Tadamon and Mall R/A to Signalized Junction
Eastern Coast
  • Entertainment city plot F1VA,residential development
  • 7 building (B+G+3) residentials apartments
  • Old Airport Building
  • Majlis Ghanam al Qubaisi Duhail Qatar
  • Al Kobeissy Private Villa